Lloyds British International Precision and Excellence: The Successful Installation of 124 Pergola Blades at Red Sea International Airport

IMG_4242

In the heart of Saudi Arabia’s ambitious tourism and development project, the Red Sea International Airport, a remarkable feat of engineering and precision was accomplished on a clear morning in early 11th of February 2025. The task at hand was the installation of pergola blades, essential components designed to enhance the airport’s aesthetic appeal whilst providing shade and comfort to its future passengers.

The operation involved lifting and positioning these large, custom-designed pergola blades, each weighing over 10 metric tons, to precise locations atop the airport’s terminal structure. The blades, crafted from high-quality aluminium steel with a sleek, modern finish, were not just functional but also a statement of architectural beauty, meant to mimic the flow of the Red Sea’s waves under the desert sun.

Preparation and Planning:

Months of meticulous planning preceded the lift. A team of seasoned engineers from Red Sea Global, Reem Aluminium, Smart Skill and Lloyds British International collaborated to ensure every aspect of the operation was failproof. We conducted extensive site surveys, performed load calculations, and simulated the lift in various weather conditions to guarantee safety and precision.

Execution:

A total of 124 pergola blades were hoisted with the utmost care into 4 separate terminal gardens each housing 31 pergola blades, the crane’s operator communicating constantly with the ground team. The blades were lifted, maneuverer through the air, and then gently lowered into place. The operation was not just about brute force but also about finesse, with every movement calculated to avoid any damage to the delicate architecture below.

Safety and Efficiency:

Safety was paramount. The area was cordoned off, and all non-essential personnel were kept at a safe distance. Wind speed monitors were set up to halt operations should conditions become unsafe. The lifting process was timed to perfection, with each blade installation taking no more than 3 hours from lift-off to secure placement.

Completion and Impact:

All pergola blades were installed, standing as silent sentinels over the terminal. The operation was not only a testament to engineering prowess but also a step forward in the project’s timeline, ensuring the airport would open on schedule. The blades now cast elegant shadows across the terminal, offering a preview of the comfort and luxury awaiting visitors to the Red Sea Project.

Conclusion:

This lifting operation at Red Sea International Airport has set a new benchmark for construction in challenging environments. It underscores Saudi Arabia’s drive towards combining technological innovation with architectural excellence, promising an airport experience that blends seamlessly with the natural beauty of its surroundings. The success of this operation will be remembered as a pivotal moment in the region’s development narrative